Lonza Biologics
Facility, PTS was the predominant E, I&C contractor on a New Bio
tech facility in Portsmouth, NH.
|
|
 |
|
Owner: |
Lonza
Biologics |
|
General
Contractor: |
Parsons
Company |
|
Project
Description: |
The project
consisted of 10 months duration with over 180,000 safe man hours
worked on the project. Some of our areas of expertise in field units
were areas such as Media Preparation, Buffer Preparation, Buffer
Hold, Purification suites, CIP backbone, Fermentation, Harvest, Bulk
Solvents and final fill areas to name a few. We were involved with
the all instrumentation installations from mounting of instrument,
tubing, cabling via field bus and profibus technologies,
terminations and verification of over 25,000 devices. Our electrical
work consisted of all UPS power delivery to field devices and all
low/medium voltage VFD type motors on the project. We also installed
all security, communication, door locks, device net, Roof fan, Gas
tank farm conduits and some associated wiring for the same. We
pulled over 750,000 feet of wire and terminated over 15,000
electrical devices, motors, disconnect and device net
configurations.
PTS worked an
aggressive schedule @ some periods of time 7 days a week 24 hours a
day to meet our deadlines and still bring the project to a safe and
quality closure. Our installation was required to meet all local,
state and FDA required standards along with NEC codes for
installation methods and was final inspected by the FDA and the
State of new Hampshire electrical board with a follow up completion
final with the New Hampshire State fire marshal with an
outstanding report of completion with high remarks for quality. |
|
|
|
|
Smith-Nephew Facility Improvements in Largo, Florida
|
|
 |
|
Owner: |
Smith-Nephew, Inc. |
|
General
Contractor: |
The Murray
Company |
|
Project
Description: |
This project
consists of the interior renovation to an existing manufacturing
area of a sanitary chemical blending facility for the Wound
Management Division of Smith-Nephew. |
|
PTS Scope of
Work: |
PTS was
responsible for all the electrical and instrumentation and controls
installation. This includes installation of all electrical conduit
raceways, fittings, boxes, control systems and panels, panel boards,
flow meters, flame arrestors, control valves, switches,
transmitters, gauges, regulators, and rupture disks. We will also be
doing all the testing of all the equipment and material. |
|
|
|
|
Smith-Nephew Facility Tanks Replacement in Largo, Florida
|
|
Owner: |
Smith-Nephew, Inc. |
|
General
Contractor: |
AB PROCESS |
|
Project
Description: |
This project
consisted of the replacement of the process' tanks as well as the
mechanical equipment associated with it, such as motor-pumps and
agitators.. |
|
PTS Scope of
Work: |
PTS was
responsible for all the electrical, instrumentation, and controls
installation. Start up and commissioning, IQ/OQ support This includes
instruments relocation, calibration and installation of all
new equipment, and programming the plant controls to meet the new
equipment specifications. |
|
|
|
|
Smith-Nephew Facility Largo, Florida
|
|
Owner: |
Smith-Nephew, Inc. |
|
Various Projects |
During several
years PTS has been the TOGO system integrator for the Smith &
Nephew facility in largo, Florida. |
|
PTS Scope of
Work: |
PTS has performed
multiple small size projects with a varieties of task that evolves
from Instrumentation installation to engineering design. |
|
|
|
|
|
Flower Bakery of Bradenton, Florida |
|
|
|
Owner: |
Flower Food Bakery
Group |
|
On call support: |
PTS has served
Flowers Bakery of Bradenton when time is crucial. Most of this work
is been done during times when operation can't tolerate
shutdowns. Allen-Bradley PLCs and controlnet network
troubleshooting. |
|
|
|
|
Pillsbury, Inc. located in Murfreesboro, Tennessee
|
|
 |
|
Owner: |
Pillsbury, Inc. |
|
A&E: |
Simons Agra |
|
Project
Description: |
Upgrade
controls on mixing and baking line |
|
PTS Scope of
Work: |
Provide process assistance, control
configuration and start-up expertise. System consisted of Modicon
Quantum PLCs using Intellution HMI |
|
|
|
|
|
Sugar
Mill located in South Bay, Florida |
|
 |
|
Owner: |
Okeelanta
Corporation |
|
Project
Description: |
Vacuum Pan
Controls upgrade |
|
PTS Scope of Work: |
Electrical
installation of control wiring for Foxboro I/A |
|
|
|
|
Sugar
Mill located in South Bay, Florida |
|
|
Owner: |
Okeelanta
Corporation |
|
OEM: |
Rosemount |
|
Project
Description: |
Continuous
Emissions Monitoring system for existing boiler. |
|
PTS Scope of Work: |
Install,
calibrate and start-up for the CEMs system. |
|
|
|
|
|
|
|
|
Dairiconcepts in
Portales, New Mexico
|
|
 |
|
Owner: |
Dairiconcepts |
|
General
Contractor: |
Garland &
Loman, Inc. |
|
A&E: |
Bayview
Engineering Group |
|
Project
Description: |
This
facility uses a new process developed in New Zealand that extracts
certain proteins from milk and is made into a high protein powdered
milk. |
|
PTS Scope of
Work: |
PTS will be installing a complete air
user system in stainless steel and supply individual air supplies to
devices where required. We will also be responsible for the
installation of all the instruments in the evaporator and dryer
process, mount all interconnecting remote terminal units, along with
the main for PLC controls system for the process, and install all
associated conduit and wiring of the complete control system. |