Palatka Generating Station located in
Palatka, Florida |
|
 |
|
Owner/Contractor: |
Seminole
Electric Co-operative, Inc. located in Tampa, Fl |
|
Project
Description: |
Pre-treatment and
Wastewater Control Panel Upgrade. Complete controls replacement of
the pre-treatment and wastewater treatment plant. New control HMI
interfaces and Controllers were installed. |
|
PTS Scope of
Work:
|
Engineering, detailed design, supply, programming,
testing, and training for the complete PLC and HMI control system. The existing
system consists of Allen-Bradley PLC 2 system communicating with
several Remote IO racks. The new system will include a Modicon
Quantum control hot standby package, which will communicate via RIO connection
to several remote IO racks. The existing hard-wired conventional
style control board will be demolished and the new interface will be
Citect SCADA software to monitor and control the pretreatment and
wastewater system. |
|
|
|
|
Tampa
Bay Desalination Facility, Tampa, Florida
|
|
|
|
Owner: |
Tampa Bay
Desal, LLC |
|
General
Contractor: |
Covanta Tampa
Construction, Inc. |
|
Project
Description: |
Construction of a
desalinization plant. Installation of potable water pipeline and
related facilities for a reverse osmosis desalination facility. |
|
PTS Scope of
Work: |
Installation of
complete and operable instrumentation and controls. This work will
be done by the fabrication of all racks, stands and special devices
to support the instruments along with the tubing and hydraulics
materials needed to install the specified technical instruments that
are to be supplied by Covanta and installed and calibrated by PTS.
PTS will also assist in the start-up of the reverse osmosis
desalinization facility. |
|
|
|
|
|
|
Water
Softener Control Panel
|
|
|
|
A&E: |
American
Engineering Services, Inc. located in Tampa, FL |
|
Project
Description: |
Supply a
dual vessel water softener skid with PLC based
control system. |
|
PTS Scope of
Work: |
PLC
programming for the control system utilizing Modicon 984 Series
hardware and Modsoft programming software. |
|
|
|
|
W.E. DUNN
Wastewater Reclamation Facility located in Pinellas County, Florida
|
|
|
|
Owner/Contractor: |
Pinellas County
located in West Central Florida |
|
Project
Description: |
System
installation and Integration for 10 Royce Analyzer Instruments
integrated in a PLC and HMI based control system using radio
frequency and RTU technology. |
|
PTS Scope of
Work:
|
Supply and
installation of all instrumentation, review and
integration of vendor supplied equipment. Supply, design, and
start-up of the PLC based control system and RTU interface with main
control center located at the admin building. Electrical terminations of all control equipment and the
Graphic and Database development at the control center The PLC
system utilized a Modicon Momentum and Wonderware HMI software. The
RTU I/O hardware was interfaced with MDS radios that
transmits the data to the slug pumping building. |
|
|
|
|
Lift
Pump Station located in Pinellas County, Florida
|
|
|
|
Owner: |
Pinellas County
located in West Central Florida |
|
A&E: |
Parson
Engineering |
|
General
Contractor: |
Beers
Construction |
|
Project
Description: |
System
Integration for grass roots 6-pump lift station |
|
PTS Scope of
Work:
|
Supply and
installation of all instrumentation, review and
integration of vendor supplied equipment. Supply, design, and
start-up of the PLC based control system and RTU interface with main
control center located at South Cross Bayou Water Treatment
Facility. Electrical terminations of all control equipment and the
Graphic and Database development at the control center The PLC
system utilized a Modicon Quantum PLC with Hot-Standby CPU’s. The
RTU consisted of OPTO22 I/O hardware with an MDS radio that
transmits the data to the South Cross-Bayou |
|
|
|
|